Excavation & Trench Edge Protection

Edge Protection Systems for Excavation & Trench

Temporary edge protection for trenches, excavations, sheet pile edges and other open groundworks areas.

APAC provides different guard and clamp systems for excavation work. The right system can be selected according to the excavation edge, fixing point and site conditions.

  • Systems for trenches and sheet pile edges
  • Clamp and guard options for different site conditions
  • Barrier, post and fixing parts supplied as a complete system
Real System Configurations

Edge Protection Systems Developed Around Real Project Needs

The excavation has sheet piles, but the customer also needs flexibility when the protected length changes.

SAFEDGE SHEET PILE CLAMP SYSTEM

Safedge Sheet Pile Edge Protection System

  • Conform to EN 13374 Standards
  • Hot-dip galvanised surface treatment
  • Prevent falls from height into excavations
SAFEDGE TRENCH GUARD tammet edge protection SYSTEM

Safedge Trench Guard Edge Protection System

  • Simple, adjustable, reusable, suitable for both short-term and long-term projects.
  • Toe board design prevents small debris from falling.
Safedge Sheet Pile Clamp Edge Protection System

TG Sheet Pile Clamp Edge Protection System

  • Optional clamp available.
  • Panels can overlap to accommodate different lengths.
  • Mesh design provides effective air circulation.
tammet edge protection SYSTEM

TG Trench Guard Edge Protection System

  • Quick installation, saving labor and offering high cost-efficiency.
  • Simple, adjustable clamping device.
  • Panels available in lengths of 1.8m and 2.6m, with 90° or 120° bends.
Choose the Fixing Method

Start With the Excavation Edge

The first thing to check is what is available around the excavation. ​

If sheet piles are already installed, a clamp system may be suitable. ​

For other trench edges, a different guard or fixing arrangement may be needed.

Fixing Method Suitable For Why Use It Typical Use
Safedge Sheet Pile Clamp Sheet pile excavations Direct fixing to the sheet pile Deep excavations and groundworks
Safedge Trench Guard Open trenches Simple reusable protection Utility and general trenches
TG Sheet Pile Clamp Sheet pile edges Works with overlapping guard panels Excavation perimeters
TG Trench Guard Trenches and groundworks Adjustable clamp and different panel lengths Civil and utility work
Custom Excavation Attachment Special edge conditions Designed around the actual fixing point Special projects and OEM systems

Have a Different Excavation Condition?

Send us your site photo, drawing or excavation details.

We can review the edge condition and help you choose a suitable edge protection system.

Technical Specifications

Check the System Before Ordering

APAC mesh barriers are available in different sizes, configurations and finishes to suit a wide range of temporary edge protection applications.

Item Specification
Material Steel
Size 1.3 m / 2.6 m / 2.9 m / Custom
Finish Galvanized + Powder Coated
Colour Yellow / Custom RAL
Type Mesh Barrier / Extension Barrier
Configuration Standard / 90° / 120°
Application Temporary Edge Protection
OEM Available
Logo Custom Logo Available
Packing Stillage / Pallet
Custom Size Available
Technical Documents Available on Request
Applications

Common Excavation Edge Protection Applications

Excavation work can appear in many types of construction projects.

The right edge protection system depends mainly on how the excavation is supported and what fixing points are available.

groundworks_temporary-edge-protection

Trenches

Temporary protection around open trenches used for utilities, drainage, and other groundworks.

Safedge Sheet Pile Clamp System

Sheet Pile Excavations

Edge protection fixed directly to sheet piles around supported excavations.

sheet-pile-edge-protection-system

Deep Excavations

Temporary protection around deep excavation areas where workers may be exposed to open edges.

Installation Process

Keep Installation Simple

The installation method depends on the selected trench guard or sheet pile clamp system.

  1. Check the Excavation Edge

    Confirm the edge condition and approved fixing position.

  2. Install the Clamp or Guard

    Fit the selected clamp or trench guard system.

  3. Install the Post

    Where a separate post is used, place the post into the attachment and secure it.

  4. Install the Barrier

    Fit the mesh barrier or guard panel into position.

  5. Check Corners and Gaps

    Make sure corners, short sections and changes in direction are protected.

  6. Final Check

    Check the complete system before work continues around the excavation.

OEM & Private Label

Adjust the System to Your Product Range

Excavation edge protection does not always use the same panel, clamp or fixing method.

For distributors, rental companies and edge protection brands, we can review existing products or new requirements and discuss suitable changes.

Product Dimensions

Selected panel, clamp or connection dimensions can be reviewed according to the application.

Clamp Design

Clamps can be developed around different sheet pile or fixing conditions where suitable.

Surface Finish

Available options may include:

  • Hot-dip galvanizing
  • Zinc coating
  • Powder coating
  • Painted finish

Colour & Branding

We can support:

  • Selected RAL colours
  • Product labels
  • Logo plates
  • Packing marks
  • Custom packaging
edge protection barrier in production line
Manufacturing & Quality

Consistent Parts for a Better System Fit

An excavation edge protection system works better when the barrier, post and clamp fit together correctly. ​

APAC checks the main dimensions and connection points during production to help reduce fitting problems during installation and reuse.

01

Material Check

Check the steel before production starts.

02

Cutting

Cut tubes, plates and mesh parts to the required size.

03

Forming

Bend and form parts according to the drawing.

04

Welding

Check the weld position and main dimensions during welding.

05

Dimension Check

Measure key areas such as clamp openings and post connections.

06

Surface Treatment

Apply the required galvanizing, coating or paint finish.

07

Assembly Check

Fit the clamp, post and barrier together to check the main connections.

08

Final Inspection

Check dimensions, appearance and quantity before packing.

09

Packing

Pack the barriers, posts, clamps and accessories according to the order.

10

Shipment Check

Confirm quantities, labels and shipping marks before loading.

Packaging & Delivery

Packaging That Makes Handling Easier

Excavation systems can contain large guard panels as well as smaller clamps and connection parts.

Good packing should make them easier to count, unload, store and move after delivery.

Mixed System Orders

Sheet pile clamps, trench guards and other parts can be packed in the same shipment according to the agreed product list.

Container Loading

We consider the packing size and loading arrangement together to make better use of container space.

From Sample to Bulk Order

Whether you need samples, a trial order or a full shipment, we follow the order through packing and delivery.

edge protection attachment in pallet
Who We Work With

Different Customers Need Different Excavation Systems

Edge Protection Brands

For companies that want to add excavation and trench systems to an existing edge protection range.

We can support OEM products, private labels and attachment development.

Specialist Distributors & Agents

For companies supplying temporary safety products to civil, groundworks and construction contractors.

Different excavation systems can help cover more site conditions.

Rental & Hire Companies

For rental companies that need products that can be installed, removed, and used again on different projects.

Simple parts and clear system combinations can also make stock management easier.

Groundworks & Civil Contractors

For contractors that need temporary protection around trenches, sheet piles and other open excavation areas.

Project Evidence

Projects From Real Constructure Projects

Browse selected edge protection references from Singapore, Malaysia, the United States, Australia, and New Zealand. Additional projects will be added as this case-study library grows.

Affin Bank Edge Protection Project
Concrete Slab

Affin Bank Edge Protection Project

Edge protection reference for the 47-storey Affin Bank headquarters development at Tun Razak Exchange in Malaysia.

Auckland Edge Protection Project
Concrete Frame

Auckland Edge Protection Project

Temporary edge protection project reference in Auckland, New Zealand, using a modular edge protection configuration for the site.

Flinders Link Project
Bridge

Flinders Link Project

APAC supplied a clamp-based edge protection system for the Flinders Link Project, reducing drilling and supporting fast, reusable bridge protection.

FAQ

Excavation Edge Protection FAQ

Which system should I use for a trench?

It depends on the trench edge, ground condition and available fixing point.

A trench guard system may be suitable where there is no sheet pile fixing point.

Which system should I use for sheet piles?

A sheet pile clamp system can be used where the clamp matches the sheet pile and fixing condition.

Send us the sheet pile details or a site photo and we can help check the option.

Can the panels overlap?

Some TG sheet pile guard panels can overlap to help adjust the protected length.

The actual panel arrangement should be confirmed for the selected system.

Do the trench guards have toe boards?

Some trench guard systems include a lower toe board section to help reduce small materials falling into the excavation.

What panel sizes are available?

For some TG trench guard systems, 1.8 m and 2.6 m panel lengths are available.

Other sizes depend on the selected product.

Start With the Excavation Edge

Send Us Your Site Photo or Drawing

You do not need to choose the system before contacting us.

Send us the excavation type, sheet pile details, drawing or site photo.

We can check the fixing condition and discuss a suitable system with you.

What Happens Next?

01 · Send the Site Information

02 · Check the Edge Condition

03 · Confirm the System

04 · Prepare the Order

Accepted: PDF, JPG, PNG, WEBP, DWG, DXF, STEP, STP, IGS, IGES. Max 20MB.

We use your name, email and message only to reply to your inquiry.