APAC BUILDER EQUIPMENT LTD

Your Best
Edge Protection Systems
Specialists in China

 

 

Who We Are

Be Your Best
Edge Protection System Partner

APAC Build Equipment Ltd was established in 2014 and has been specializing in edge protection systems for many years. With over 200 different parts to choose from, all of which are compatible with each other, we can create a customized edge protection system that is perfectly suited to your construction site needs. Our team of experienced professionals is committed to providing you with the support you need to get the job done right.

What We Do

Develop Comprehensive Solutions For Each Construction Site

Our edge protection system is divided into 7 categories, applicable to concrete structures, steel structures, staircase structures, formwork structures, and so on.
And all our edge protection systems are conformed to  BS EN 13374 Standard.

icon-image

Edge Protection System for Concrete Edge

In addition to the system on the left, there are still a widest selection of components and accessories to fit your construction site and they are compatible with each other.
  • Edge Bracket Edge Protection System
  • Slab Grab Edge Protection System
  • TG Bolt Down Edge Protection system
icon-image

Edge Protection System for Steel Structure

This edge protection system is designed to meet the diversity of steel structures and we offer different solutions.
  • I-Beam Clamp Edge Protection System
  • I-Beam Facade Bracket Protection System
icon-image

Edge Protection System for Steel Stairs

This kind of edge protection system create a temporary safety handrail for staircases.
  • Clamp On Stair Edge Protection System
  • Mesh Barrier Stair Edge Protection System
  • Socket Base Stairway Edge Protection System
icon-image

Edge Protection System for Formwork Structure

Fit all sizes of aluminum and H20 wood beam profiles.
  • H20 Beam Clamp Edge Protecion System
  • Aluminium Beam Clamp Edge Protection System
icon-image

Guardrail System

Quickly build guardrails around the edge of worksite.

  • Grabber Guardrail System
  • Base Guardrail System
  • Roof Guardrail System
  • Parapet Guardrail System
icon-image

Compression Post

Edge protection system used between slabs. Not anchored or bolted. No need to harm the surface.
  • Door-to-Door Service.
  • Meet BS EN 13374 Standard.
  • Double mesh barrier, comprehensive protection.
icon-image

Safety Net Fans

Placed on the outside of the edge of the floor.

Prevent workers from falling and reduce injuries.

  • Rigorous Tensile and Impact Testing
  • Meet EN 1263-1 Type T.
  • Door-to-Door Service.
  • Print Your Logo to the Net.
Why Choose us

All-Around Construction Edge Protection Solutions

Expertise

7+ Years of Expertise
Professional Technical Support

Reputation

Corporate With Vendor of World Top 50 Construction Companies

Productivity

Factory Direct
Superb Edge Protection Productivity

Quality

Strict Quality Control Covering the Entire Production Process

Design

3D Display Helps Your Projects Become More Visible

Over the past years, we have worked with customers from UK, AU, NZ, SG, MY, etc, building a reputation for flexibility and responsiveness. We are committed to providing the most professional service possible, and our team goes above and beyond to ensure your needs are met, no matter the scope or complexity of your project.

We provide 3D & CAD design services, so that once we have your instructions, we can recommend and create the exact product you’re looking for. We’ll even help you choose colors, materials, and accessories based on what’s most important to your project.

Projects

Latest completed projects

ACRE WORKS SDN BHD J107 Project in Singapore

ACRE WORKS SDN BHD J107 Project in Singapore


APAC> Blog
edge protection projects in sg

Category

Edge Protection System

Completed Date

Mar 2021 – Mar 2024

Location

Singapore

Case: ACRE WORKS SDN BHD J107 Project

– Design and Construction of Gek Poh Station, Tawas Station & Viaduct, Jurong Region Line, Singapore

Time: Mar 2021 – Mar 2024

​Total Length: 1.3KM

APAC Edge Protection View:

slab edge protection system
slab edge protection
Work With Us !

Consult Your Edge Protection System Experts

Running a construction project is no easy task, you have to give prominence to worker’s safety on your site every day.
APAC’s goal Is to prevent falls before they even happen, keeping your project profitable and smooth.
No matter the application, our solutions meet your needs.


Connect To Your Next Successful Project!

Affin Bank Project in Malaysia

Affin Bank Project in Malaysia


APAC> Blog

Category

Edge Protection System

Client

IJM

Completed Date

2018

Location

Kuala Lumpur, Malaysia

Project Site: Kuala Lumpur, Malaysia
Client: IJM construction and IJM was incorporated in 1990 and is based in Petaling Jaya, and in the year 2018, IJM construction has been awarded an RM505 million superstructure contract from Affin Bank Bhd for the construction of its new 47-story headquarters at Tun Razak Exchange (TRX).
Edge protection Supplier: APAC Builders Equipment
Complete Year: 2018

Affin Bank New Building:

temporary-edge-project-Projet-View

APAC Edge Protection for Affin Bank Project:

Affin Bank edge protection system Project in Malaysia

Back To Projects Page >>

Work With Us !

Consult Your Edge Protection System Experts

Running a construction project is no easy task, you have to give prominence to worker’s safety on your site every day.
APAC’s goal Is to prevent falls before they even happen, keeping your project profitable and smooth.
No matter the application, our solutions meet your needs.


Connect To Your Next Successful Project!

GS E&C T301 Project in Singapore

T301 Project in Singapore


APAC> Blog

Category

Edge Protection System

Client

GS E&C

Completed Date

2018

Location

SA, Australia

Project site: T301 Project in Singapore
Contractor:  GS Engineering & Construction Co., Ltd.
Edge Protection Supplier: APAC Builders Equipment Co., Ltd

GS E&C is the world’s top 50 construction contractor founded in 1969 in Korea, APAC provided 3.5 km edge protection systems for their T301 project in Singapore year 2018.

Projet View:

temporary-edge-project-Projet-View

APAC Mesh Panel View:

temporary-edge-project-Projet-View

APAC Socket Base View:

temporary-edge-project-Projet-View

With our edge protections’ help, GS E&C has achieved 20 million accident-free man-hours during the construction of the T301 project.


Back To Projects Page >>

Work With Us !

Consult Your Edge Protection System Experts

Running a construction project is no easy task, you have to give prominence to worker’s safety on your site every day.
APAC’s goal Is to prevent falls before they even happen, keeping your project profitable and smooth.
No matter the application, our solutions meet your needs.


Connect To Your Next Successful Project!

  • client: Dr. Devis
  • Location: USA
  • Surface Area: 75,020 m
  • Architect: Alex Hales
  • Year Of Complited: 2017
  • Project Value: $950000

Edge Protection in Fort Worth, Texas

Edge Protection in Fort Worth, Texas


APAC> Blog

Category

Edge Protection System

Client

Green Guard

Completed Date

2017

Location

Fort Worth, Texas

Project site: Fort Worth, Texas
Contractor: Green Guard

Guard Green Guard was founded in the year 1907, Green Guard provides products to help you create a safer, cleaner, healthier, and more attractive work environment while reducing your facility services expense.
Complete Year: 2017

Projet View:

edge protection system project usa
edge protection in fort worth texas

Back To Projects Page >>

Work With Us !

Consult Your Edge Protection System Experts

Running a construction project is no easy task, you have to give prominence to worker’s safety on your site every day.
APAC’s goal Is to prevent falls before they even happen, keeping your project profitable and smooth.
No matter the application, our solutions meet your needs.


Connect To Your Next Successful Project!

  • client: Dr. Devis
  • Location: USA
  • Surface Area: 75,020 m
  • Architect: Alex Hales
  • Year Of Complited: 2017
  • Project Value: $950000

Parapet Edge Protection to SA, Australia

Parapet Edge Protection to SA, Australia


APAC> Blog

Category

Edge Protection System

Client

Access Corporate Group

Completed Date

2019

Location

SA, AUSTRALIA

Project site: SA, Australia
Contractor: Access Corporate Group

Established in 1999, CG has grown to become the largest access company in Australia and New Zealand.

CG has become an integrated services provider with the addition of cladding, insulation, sheet metal work, rope access, and paint and blasting.

Edge Protection Supplier: APAC Builders Equipment Co., Ltd

Projet View:

parapet edge protection to au

Challenge: Before us APAC Parapet Edge Protection, our clients use tubing and couplers fixed to the slab as the guardrail. It costs a lot of labor works and time.

Benifit of APAC Parapet Edge Protection:

  • Simple – The system uses only 3 components to ensure ease of installation
  • Durable – HDG surface treatment
  • Versatile – Easy to assemble and install
  • Compliant – Complies with EN 13374 AS/NZS 4994.1

PARAPET EDGE PROTECTION TO SA, AUSTRALIA

APAC parapet edge protection uses a multi slab clamp to grab the slab, very easy to install, then insert a safety post into the slab clamp, at the last is put the link bar into the latch housing, lock it safely by the latch pin. Three steps make the installation simple, save labor cost.


Back To Projects Page >>

Work With Us !

Consult Your Edge Protection System Experts

Running a construction project is no easy task, you have to give prominence to worker’s safety on your site every day.
APAC’s goal Is to prevent falls before they even happen, keeping your project profitable and smooth.
No matter the application, our solutions meet your needs.


Connect To Your Next Successful Project!

  • client: Dr. Devis
  • Location: USA
  • Surface Area: 75,020 m
  • Architect: Alex Hales
  • Year Of Complited: 2017
  • Project Value: $950000

Edge Protection Systems in Auckland, New Zealand

Edge protection systems in Auckland, New Zealand


APAC> Blog

Category

Edge Protection System

Location

Auckland, New Zealand

Project: NZICC Auckland
Edge Protection Supplier: APAC Builders Equipment
APAC supplies a wide range of edge protection systems to suit your specific building requirements, the purpose of the system is to prevent persons, objects, or materials falling from height.

Projet View:

edge protection project nz
Edge Protection Systems In Auckland New Zealand

Back To Projects Page >>

Work With Us !

Consult Your Edge Protection System Experts

Running a construction project is no easy task, you have to give prominence to worker’s safety on your site every day.
APAC’s goal Is to prevent falls before they even happen, keeping your project profitable and smooth.
No matter the application, our solutions meet your needs.


Connect To Your Next Successful Project!

  • client: Dr. Devis
  • Location: USA
  • Surface Area: 75,020 m
  • Architect: Alex Hales
  • Year Of Complited: 2017
  • Project Value: $950000
Our Clients

Who We Work And What They Say

Our commitment to quality and exceptional service has helped us establish long-term partnerships with many satisfied customers.

Sasa Manojlovic
Sasa ManojlovicCEO
Read More
From my impression of your factory I am sure you can do sufficient quality - that is the reason why I think we can do this business together.
Brian Gordon
Brian GordonFounder
Read More
Good quality is the base for every business especially if you see it for the long term, which I will do. From my impression of your factory I am sure you can do sufficient quality - that is the reason why I think we can do this business together, even your final price is now a little bit higher than calculated before.
Waldemar Keck
Waldemar KeckDirect Manager
Read More
Thanks for the first 2 containers, the gear is in good order. Look forward to doing more business together.
Inquiry & Consult
Design & Order
Production & Inspection
Packing & Delivery

Working skill

86%

Client rating

News & Blog

Our Latest News Post And Articles

image

Office

388 Dongwu South Road, Suzhou,
Jiangsu, China

image

Email us

info@apacltd.com

image

Call us

+(86) 512-6670-0084
+(86) 186-2611-7708

Let's Talk

Have an upcoming project?

Contact Us